Home » Atomic Energy » Power Generation Through Nuclear Energy 

Power Generation Through Nuclear Energy 

Atomic Energy Commission (AEC) set up in 1958, is the apex body regarding use of nuclear energy, it formulates policy of the Department of Atomic Energy in all matters concerning nuclear energy.

The targets for nuclear power generation are set on an annual basis, as a part of Nuclear Power Corporation of India Limited (NPCIL)’s annual Memorandum of Understanding (MoU) with Department of Atomic Energy (DAE) considering planned biennial shutdowns (BSD) of units during the year, connections of new units to the grid if any, during the year etc. The generation target for the year 2018-19 was 36904 Million Units (MUs).

The actual generation in the year 2018-19 was 37813 MUs.

The Government has planned to increase the installed capacity base of nuclear power in the country for increased electricity production from nuclear power. The present installed nuclear power capacity of 6780 MW would reach 13480 MW by the year 2024-25 with the completion of projects under construction (including 500 MW Prototype Fast Breeder Reactor (PFBR), being implemented by Bharatiya Nabhikiya Vidyut Nigam Ltd. (BHAVINI). The Government has also accorded administrative approval and financial sanction for 12 nuclear power reactors aggregating a total capacity of 9000 MW, which are scheduled to be completed progressively by the year 2031. On their completion, the total nuclear power capacity would reach 22480 MW. More reactors based on both indigenous technologies and with foreign cooperation may be planned in the future.

This information was provided by the Union Minister of State (Independent Charge) Development of North-Eastern Region (DoNER), MoS PMO, Personnel, Public Grievances & Pensions, Atomic Energy and Space, Dr Jitendra Singh in written reply to a question in Lok Sabha

About ppb

Leave a Reply

Your email address will not be published. Required fields are marked *

*

x

Check Also

Banking facilities in rural areas

To ensure availability of banking outlet (Bank branch/Business Correspondent (BC), within 5 kilometers of all ...

Production of Sail

Steel Authority of India Limited (SAIL) had undertaken Modernization and Expansion of its five Integrated ...

Major Port Authorities Bill 2020 Introduced in The Loksabha

Major Port Authorities Bill 2020 was introduced in the Loksabha by the minister of state ...

Parliament Passes The Mineral Laws (Amendment) Bill, 2020

Parliament passed The Mineral Laws (Amendment) Bill, 2020 for amendments in Mines & Mineral (Development ...

Subsidy to Artisans under Solar Charkha Mission

The scheme Mission Solar Charkha is enterprise driven scheme and envisages setting up of ‘Solar ...

Public Enterprises Survey 2018-19 Tabled in Parliament

Total Paid up Capital in all CPSES as on 31.3.2019 Stood at Rs. 2,75,697 Crore ...

Rising Demand of Oil

As per World Energy Outlook 2019 published by International Energy Agency, India’s oil demand in ...

Coal stocks at power plants increase by 77% to 34.25 MT: Pralhad Joshi

Coal stocks at power plants peaked to 34.25 million tonnes on January 26, equivalent to ...

73.47 Lakh  Candidates Trained Under Pradhan Mantri Kaushal Vikas Yojana (PMKVY)

Under the Skill India Mission, Ministry of Skill Development and Entrepreneurship is implementing a flagship ...

977 Steel Plants in the country

The total number of steel plants in the country is 977.  In the public sector, ...

WP2Social Auto Publish Powered By : XYZScripts.com