Home » INDUSTRIALISATION AND MANUFACTURING » JSPL-Angul posts record production of Hot Metal

JSPL-Angul posts record production of Hot Metal

 India’s largest Blast Furnace at JSPL Angul Odisha has produced its highest ever Hot Metal production of 10845 MT for a single day on 2nd July 2019. It is also reported that this is the ever highest production produced by any of the BFs in India.

 The furnace is stable for the last one week and has continuously produced more than 10,000 Tons per day. The largest BF of country having volume of 4554 m3 is running smoothly to cater the maximum need of hot metal for 6 MTPA capacity of Steel Melt Shop.It is noteworthy that JSPL’s 6MTPA Integrated steel making complex at Angul is the most modern and Odisha’s largest integrated steel plant.

.

About ppb

Leave a Reply

Your email address will not be published. Required fields are marked *

*

x

Check Also

Competition Commission of India notifies three distinct regulations on determination of turnover, settlement, commitment and penalty guidelines in relation to an enterprise

The Competition Commission of India (CCI) has notified three regulations viz. THE CCI (SETTLEMENT) REGULATIONS, 2024; THE ...

DoT initiates Spectrum Auction to augment the existing telecom services and maintain continuity of services Issues Notice Inviting Applications today to this effect

Department of Telecom (DoT) has initiated the Spectrum Auction to augment the existing telecom services ...

CIL Achieves Record Coal Production of 703.91 MT up to 7th March 2024

The Coal India Limited (CIL) has achieved a record production of 703.91 million tonnes (MT) ...

ChipIN, the one-stop centre for chip designers across the country, gets fillip with support from semiconductor industry leaders

“This is a huge opportunity for current and budding entrepreneurs from Trivandrum and Kerala, to ...

Make in India not only for India but for the world: Power and New & Renewable Energy Minister Shri R. K. Singh exhorts manufacturing industry

The Union Minister for Power and New & Renewable Energy Shri R. K. Singh has ...

Measures by Government shall lead to three-fold increase in Natural Gas consumption by 2030: Petroleum Minister Hardeep S Puri

In a significant stride towards achieving 100% coverage of country’s area for the development of ...

Historical Coal Production growth: Cheaper and Assured Availability

Our country is endowed with 5th largest geological reserves of coal.  We are 2nd largest consumers of ...

Coal Production and Dispatch from Captive and Commercial Mines Goes up by 27% and 29% respectively during Current Fiscal upto February 2024

There is month on month (m-o-m) and year-on-year (yoy) increase in coal production and dispatch ...

Shri Dharmendra Pradhan launches Project ODISERV

Union Minister of Education and Skill Development & Entrepreneurship, Shri Dharmendra Pradhan, launched Project ODISERV ...

Indian Railways achieve 1434.03 MT freight loading till February, 2024

On cumulative basis from April 2023 – February 2024, freight loading of 1434.01 MT was ...

WP2Social Auto Publish Powered By : XYZScripts.com